Қазақстан темiр жолы

News

New traction power supply facilities commissioned on Zhambyl division sections




28-07-2026

Autotransformer posts have been commissioned on the Kuragatty – Aspara and Tatty – Kuragatty sections of the Zhambyl Infrastructure Division. Installed in areas with challenging terrain, these facilities maintain the required voltage in the overhead catenary system, reduce power losses, and ensure the uninterrupted operation of railway infrastructure even during periods of heavy train traffic.

Press service of JSC «NC«Kazakhstan Temir Zholy»

 

© «Қазақстан темір жолы» Ұлттық компаниясы» АҚ