New automatic block signaling facilities have been put into operation on two sections of the railway

News

New automatic block signaling facilities have been put into operation on two sections of the railway




29-07-2026

As part of the infrastructure projects of JSC "NC "KTZ", work has been completed on connecting two railway stages to the automatic block signaling system.

On the Kandyagash – Tobol section, the Razyezd No. 2 – Nikeltau stage, spanning 15 km, was connected to the automatic block signaling system. Concurrently, a new passing loop (razyezd) was put into operation.

On the Kyzylzhar – Saksaulskaya section, the Koskol – Razyezd No. 8 stage, spanning 28 km, was connected to the automatic block signaling system. Additionally, the new Razyezd No. 3 was put into operation.

The commissioning of these new facilities will enhance train traffic safety, increase the throughput capacity of the sections, and ensure a more efficient organization of the transportation process.

Press service of JSC «NC«Kazakhstan Temir Zholy»

 

© «Қазақстан темір жолы» Ұлттық компаниясы» АҚ