KTZ and major shippers discussed transportation plans until the end of the year
20-08-2025
A meeting was held at NC Kazakhstan Temir Zholy JSC with the participation of major shippers, including Bogatyr Komir LLP, Zhairemsky GOK JSC, ERG, Shubarkol Komir JSC, SSGPO JSC, Qarmet JSC, Shubarkol Premium LLP, Tranco PL LLP (Kazakhmys), Kazphosphate LLP and other companies.
The results of transportation for the first half of the year and plans for the remainder of 2025 were discussed.
According to the results of the first half of the year, an increase in transportation was recorded. In exports, the volumes of coal (+1.9 million tons), grain (+2 million tons), fertilizers (+105 thousand tons), oil (+67 thousand tons), and other cargo (compound feed, vegetable oil, asbestos) (+745 thousand tons) increased. In intra-republican transportation, the volumes of oil (+49 thousand tons), oil products (+685 thousand tons), construction cargo (+496 thousand tons), grain (+540 thousand tons), chemicals (+44 thousand tons), fertilizers (+373 thousand tons), and non-ferrous metals (+14 thousand tons) increased.
The key issue of the meeting was the pilot implementation of the project for verifying GU-12 form applications in the ACS ССW (ASU DKR) system, which started on June 20. The introduction of the system into industrial operation will improve the transparency and efficiency of the use of the rolling stock. It is planned to involve all operators and owners of rolling stock in the project. Participants were also presented with plans for large-scale infrastructure work: construction of additional tracks on the Aksu-Degelen section, implementation of automatic blocking on the Zhezkazgan-Saksaulskaya line, construction of separating points on the Aiteke bi-Tobol section and carrying out medium-term repairs on a number of network sections.
KTZ will continue its systematic work with shippers.
Press service of JSC «NC«Kazakhstan Temir Zholy»